igoldsmid
02-28-2006, 08:44 PM
I don't know whether this is good or bad practice - but I do this quite a lot and it works for me, which is to turn any item/document type into a Task - that is to add task category attributes to an item or doc that was not created as an 'official' task...
And when I do this I would, instead of having to add a number of task attributes one by one, like to be able to add the entire set, or category of task attributes in one operation.
I was wondering whether others thought this crazy, or a good thing? And therefore whether Kevin might choose to add this capability to the new features TBA list.
And when I do this I would, instead of having to add a number of task attributes one by one, like to be able to add the entire set, or category of task attributes in one operation.
I was wondering whether others thought this crazy, or a good thing? And therefore whether Kevin might choose to add this capability to the new features TBA list.