05-18-2007, 02:46 AM
Maybe I'm old-fashioned, but having a checkbox in the tree for tasks, would help.
I have checked and it seems to be possible with the tree control used.
I know I could assign different icons but it's far from comfortable.
Moreover, with checkbox, other things could be doable, like a strike-out font or shaded font color for completed task.
I have checked and it seems to be possible with the tree control used.
I know I could assign different icons but it's far from comfortable.
Moreover, with checkbox, other things could be doable, like a strike-out font or shaded font color for completed task.