PDA

View Full Version : A Linked Document Item: How's Date Created/modified Determined?


cnewtonne
03-06-2008, 03:53 PM
Hi all,

I noticed when linking a doc item, UR uses the doc's date created/modified per the OS to populate the respective UR attributes. An doc linked today into UR showed both dates as of 05,2007 since this is what the OS is showing.

I have a saved search to show me items created/modified today, but because of this behavior, these linked docs do not show in the search results.

Where in UR or what attributes areused to track the doc's dates as created/modified in UR irrespective of these dates on the OS?

Thank you

kinook
03-06-2008, 05:30 PM
The Date Modified attribute will update if the item (attributes, etc.) is modified within. The Date Created attribute can be manually edited if desired. The Sync Date attribute tracks when the item was last synced in UR.

cnewtonne
03-06-2008, 07:29 PM
The sync date does it. Thank you