Kinook Software Forum

Kinook Software Forum (https://www.kinook.com/Forum/index.php)
-   [UR] General Discussion (https://www.kinook.com/Forum/forumdisplay.php?f=23)
-   -   Quick Search on Begin Date (https://www.kinook.com/Forum/showthread.php?t=2403)

janrif 03-17-2007 07:02 PM

Quick Search on Begin Date
 
yields false results here.

search for begin dates
select one item & remove begin date by unchecking
re-search same criteria
In my test, items w/o begin date still appears in list

Also trying to figure out how to remove/delete/undo pending reminders on items that have been done/completed. There are a lot of un-necssary reminders in the db -- don't know if this makes any difference.

Wondering if there is value in linking 'done' to reminder, i.e when something is done, remindr is automatically cancelled.

Thank you.

kinook 03-19-2007 12:37 PM

That works as expected here. Please ZIP and send or post a .urd file that demonstrates the problem.

janrif 03-19-2007 01:11 PM

Quote:

Originally posted by kinook
That works as expected here. Please ZIP and send or post a .urd file that demonstrates the problem.
Do you mean marking a reminder item w Date Completed removes the reminder on your system or what exactly?

kinook 03-19-2007 01:45 PM

Re: Quick Search on Begin Date
 
Quote:

Originally posted by janrif
search for begin dates
select one item & remove begin date by unchecking
re-search same criteria
In my test, items w/o begin date still appears in list

I had an item with a Begin Date of 3/27/2007. Performed an Advanced Search of Begin Date equals 3/27/2007 and the item was found. I made the Begin Date of that item null by unchecking its value. Performed the search again and it was not found.

Quote:

Also trying to figure out how to remove/delete/undo pending reminders on items that have been done/completed. There are a lot of un-necssary reminders in the db -- don't know if this makes any difference.
Clear the Reminder or Begin Date/Time attributes.

janrif 03-19-2007 01:53 PM

OK, thank you but I guess I'm suggesting that the completed flag or "done" attribute or "date completed" attribute -- something -- be connected to reminder vs the steps you've listed. To me it's logical that if I click "done" in some manner, that whatever shows it is pending is un-set automatically since it is illogical to have one item pending and done at the same time. Maybe I'm missing something.


All times are GMT -5. The time now is 09:25 PM.


Copyright © 1999-2023 Kinook Software, Inc.