
04-29-2008, 10:29 AM
|
Administrator
|
|
Join Date: 03-06-2001
Location: Colorado
Posts: 6,049
|
|
See the attached sample. If the 'test' step fails to build, the 'Handle test failure' failure subroutine will be built, and the build will continue with the next project step.
http://www.visualbuild.com/Manual/stepfailure.htm
http://www.visualbuild.com/Manual/failurestepstab.htm
http://www.visualbuild.com/Manual/steppanes.htm
|