View Single Post
  #3  
Old 03-06-2003, 08:56 PM
trippcr trippcr is online now
Registered User
 
Join Date: 12-09-2002
Posts: 4
Hello,
My experience has been that the FAILSTEP marcos are only available in the Failure Steps tab not in the Project Steps tab. Most of the time I don't want the build to stop on those step if they fail, rather I just record that they failed and move on to other steps. For those cases I use the LASTSTEP_STATUS macro to check the status and then record the name and output if there was a failure in the main Project steps tab.

-Corey
Reply With Quote