View Single Post
  #2  
Old 06-21-2007, 01:57 PM
kevina kevina is online now
Registered User
 
Join Date: 03-26-2003
Posts: 825
A bug existed in 3.1.1 which prevented the Priority values updated in Ultra Recall from fully syncing in Outlook Tasks. In addition, the full "1-High", "2-Normal", "3-Low" value was required to be entered - only the number should be required since the Priority attribute is defined as Numeric.

The latest Ultra Recall Pro 3.1.1 installation file has been updated to address both of these issues. Please download and install the latest installation file and confirm that the issue is resolved for you.
Reply With Quote