View Single Post
  #14  
Old 08-30-2007, 07:37 AM
teognost teognost is online now
Registered User
 
Join Date: 05-25-2004
Location: Prague,Czech Republic
Posts: 200
In the last sample (transform3.bld)-how can I write in log-step "Do stuff with node value"- >for every path the related revision (written in <logentry
revision="xxxxx">)?
Basically one logentry has one revision and multiple paths.
Reply With Quote