Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion
FAQ Community Calendar Today's Posts Search

Reply
 
Thread Tools Rate Thread Display Modes
  #1  
Old 10-03-2007, 11:37 AM
Dave_Novak Dave_Novak is online now
Registered User
 
Join Date: 04-13-2006
Location: Atlanta, GA
Posts: 64
Upgrading from VBP 6.3

Hi --

I'm a long-time VBP user. Love the product. Things have gone so well for us and our build process is stabilized such that I have not upgraded since VBP 6.3. I’m considering that now, however, mainly for the reason of not falling behind.

Could you please tell me any changes that I may need to be aware of if I upgrade? In particular, has any 6.3 feature or behavior been modified in a way that would require me to make changes in my VBP code when I upgrade? I've read all the release notes and nothing sticks out to me as an issue, but I figured I should still ask.

Thanks in advance,

--Dave Novak

Last edited by Dave_Novak; 10-03-2007 at 12:02 PM.
Reply With Quote
  #2  
Old 10-03-2007, 01:54 PM
kinook kinook is online now
Administrator
 
Join Date: 03-06-2001
Location: Colorado
Posts: 6,034
There haven't been any changes that should cause problems when upgrading from v6.3.
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 10:21 AM.


Copyright © 1999-2023 Kinook Software, Inc.