Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 05-01-2009, 02:24 PM
lherz lherz is online now
Registered User
 
Join Date: 07-21-2005
Posts: 15
End project based upon Macro value

How do I quit a project from within a step?

Actually I do not just want to quit the project but fail a step that will then call a specific fail step to send an appropriate e-mail before quitting.

I am testing for the existence of data in a macro, and have that piece working, but just seem to be drawing a blank on how to get the step to conditionally fire the fail steps to send the e-mail and quit gracefully.
Reply With Quote
 

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 11:48 AM.


Copyright © 1999-2023 Kinook Software, Inc.