#1
|
|||
|
|||
Multi-conditional steps
Hi
I'm working on my very first build process and my brain has gone into a (newarly terminal) loop over this. Help please What I'm trying to do is, * Build a VB project * if the output string contains "not building (no changes)..." log a message saying that the build was skipped * if the output string doesn't contain that and the status is 0 then log a message saying "build successful" * if the status isn't 0 and the output string contains "compatibility error " then jump to another sub routine that'll handle that situation * if the status isn't 0 and the output string is anything else then go to a subroutine that'll log the failure and end the build. It seems that what I need is to capture both the StepStatus and StepOutput (into temporary macros) at the same time but I can't see a way to do this. I assume I'm missing something obvious but as I say I have a brain failure. Any ideas? Cheers Sam |
Thread Tools | |
Display Modes | Rate This Thread |
|
|