Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] Third Party Tools

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 11-28-2006, 09:09 AM
PepeGSay PepeGSay is online now
Registered User
 
Join Date: 06-15-2004
Posts: 5
Using Results of Vault Command in Another Command

I am trying to only get files that have changed between two labels in Vault.

I have used the history command to retrieve the list of files that have changed, but how do I feed that list into another step in Visual Build Pro to GET those files?
Reply With Quote
 

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 04:22 PM.


Copyright © 1999-2023 Kinook Software, Inc.