#1
|
|||
|
|||
synchronizing priority attribute
When I synchronize Task items to and from Outlook, I get the following:
- if I change any attribute in a Task item, including Priority, then sync, the Priority attribute in UR of the corresponding item is set to 1-High, 2-Normal, or 3-Low. - if I change the Priority attribute in UR and sync, changes to all other attributes are sync'd to the corresponding item in Outlook but the Priority attribute in the Outlook item does not change. I have tried changing UR Priority attribute to: 1-High, 2-Normal, or 3-Low, to 1, 2, or 3, and to High, Normal, or Low, but the change is never sync'd to the Outlook item. Am I doing something wrong? What should I be setting the Priority to in UR? And wouldn't it be better to just sync High, Normal, and Low in Outlook to 1, 2, and 3 in UR? |
Thread Tools | |
Display Modes | Rate This Thread |
|
|