Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion
FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 05-27-2008, 05:11 PM
garyb@se.rr.com garyb@se.rr.com is online now
Registered User
 
Join Date: 02-19-2004
Location: Saint Augustine, FL
Posts: 21
Question Repeating a project step on Fail

I am having trouble in VBP where when it's running the installshield command line programs or automation, output is being sent to my \TEMP folder in temp sub folders, however installshield is attempting to delete the temp output and fails because something has the folder locked.

If I hit F7 in VBP it tries to rerun the step and typically succeeds.

What I would like to do is have VBP repeat the step automatically if the step fails.

Can someone point me in the right direction?

I have been reading about the failure build steps but cannot seem to equate them to what I want to do.

Thanks.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 07:58 AM.


Copyright © 1999-2023 Kinook Software, Inc.