Date time format issue

I am moving all the builds to a new box,I have set regional and language options to English US .Short date format is :M/d/yyyy
and date separator is /.I have done this for my user and for the user used to launch scheduled tasks also.
However when the buils scheduled task is started-the date time in log appear in a different format:
//**************
18.3.2009 20:01:07: Building project step 'SET TIME_START Macro'...
Updated Project macro 'TIME_START'
18.3.2009 20:01:07: Building project step 'Log the start time'...
TIME_START is 18.3.2009 20:01:07
//**************
I set TIME_START (with a set Macro step) to %DATETIME%.
I do not understand why it appears in this format.
Later I set TIME_END also to %DATETIME%:
//***************
18.3.2009 20:13:21: Building project step 'SET TIME_END Macro'...
Updated Project macro 'TIME_END'
18.3.2009 20:13:21: Building project step 'Log the end time'...
TIME_END is 18.3.2009 20:13:21
//***************
and then the build fails when setting the time interval:
//***************
18.3.2009 20:13:21: Building project step 'set the time interval between TIME_START and TIME_END'...
Error in Run Script (VBScript) script code at Line 6, Column 1 (Type mismatch: '[string: "18.3.2009 20:13:21"]')
18.3.2009 20:13:21: Step 'set the time interval between TIME_START and TIME_END' failed
//***************
The VBScript code for this step is:
//**********
Set ts = vbld_AllMacros()("TIME_START")
Set te = vbld_AllMacros()("TIME_END")
Set ti = vbld_AllMacros()("TIME_INTERVAL")
Set svnd = vbld_AllMacros()("SVN_DURATION")

ti.Value=DateDiff("s",ts.Value,te.Value)
svnd.Value=ti.Value
Builder.LogMessage "Elapsed time for step (seconds) = " &ti.Value
//************
Any idea how to fix this error?
Normally the dates should appear like :
3/18/2009 8:01:07 PM and 3/18/2009 8:13:21 PM and this way I will not have any error when calculating the time interval.
When I open the VBP project and try to run manually these steps -everything is set correctly.Only when running from sch task I have this error.
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 10:08 AM.


Copyright © 1999-2023 Kinook Software, Inc.