#1
|
|||
|
|||
How to Execute a Step after Script Created Steps
Hi,
I am trying to execute one specific step that I created using the GUI after the steps that I created with the Run Script step. The problem is that the steps that the "Run Script" creates dynamically are thrown always at the end of the execution list and this specific step that I created using the GUI is brought up in the list and executes sooner. I know that I can create this same final step with script but I was wondering if there is already something built-in to execute at the end of the project execution list. Thanks, Rodrigo Reboucas |
|
|