Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion
FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-14-2010, 05:29 AM
ASolovey ASolovey is online now
Registered User
 
Join Date: 05-25-2005
Posts: 13
Start/Stop service with wait

Hi,

We'd like to control service during build procedure.
We need to stop it AND WAIT UNTIL it starts,
then we need to start it AND WAIT UNTIL it stops.

I don't see now how to do that.
The timeout option of "service" step doesn't do that.
It seems that this step simply waits this "timeout" checking the service to BEGIN DOING THE ACTION rather than wait for its completion.

The behavior is this:
We stop the service with timeout=15 sec, the service doesn't stop within this timeframe, but step succeeds immediately without any wait. Then we're trying to start the service and it of course says that the service is already running with no fail (noticed that latter is by design).

Could you please advise us:
1) How to wait until the service really completed the action?
2) how to check the state of the service and perform some other steps conditionally depending on its state?

Thanks!
P.S. We're using VBP 7.1
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 05:14 AM.


Copyright © 1999-2023 Kinook Software, Inc.