Kinook Software Forum

Go Back   Kinook Software Forum > Ultra Recall > [UR] General Discussion
FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 01-26-2005, 11:37 PM
wussery wussery is online now
Registered User
 
Join Date: 01-17-2005
Posts: 36
Template Help

I am trying to create a To-Do Template based off the Task Template. The steps that I'm taking are:

I click on the Task Template in the Template section. I copy the task (CRTL-C) and then CTRL-V. I now have a child item under my original template task called New Task. I move the New Task to a Parent position still within the Template section.

I then click on the New Task Template and then open up the Attributes Window. It currently shows Due Date, Needed By and Priority. I want to remove Due Date and Needed By and create one with To-Do and Priority. So I click on Due Date and then the delete button within the attributes pane. A box pops up asking me if I want to delete the Due Dates field. I answer yes. I do the same thing for Needed By.

I then click on the Insert button and an Insert Item Attribute window opens up. I click on Name and select To-Do from my drop down list. I have previously added this attribute with a Category of Task and Type of Date.

It adds the To-Do item to the Attributes page and I deselect the check mark next to the date and then close the Attribute window. I click on the New Task and press INSERT, but the child item has Due Date and Needed By in the Task section, even thought the Parent ONLY has To-Do in the Task section. What am I doing wrong?
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 02:21 AM.


Copyright © 1999-2023 Kinook Software, Inc.