Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion
FAQ Community Calendar Today's Posts Search

 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 06-07-2005, 09:31 AM
SamS SamS is online now
Registered User
 
Join Date: 10-12-2004
Location: London
Posts: 9
Multi-conditional steps

Hi

I'm working on my very first build process and my brain has gone into a (newarly terminal) loop over this. Help please

What I'm trying to do is,

* Build a VB project
* if the output string contains "not building (no changes)..." log a message saying that the build was skipped
* if the output string doesn't contain that and the status is 0 then log a message saying "build successful"
* if the status isn't 0 and the output string contains "compatibility error " then jump to another sub routine that'll handle that situation
* if the status isn't 0 and the output string is anything else then go to a subroutine that'll log the failure and end the build.

It seems that what I need is to capture both the StepStatus and StepOutput (into temporary macros) at the same time but I can't see a way to do this.

I assume I'm missing something obvious but as I say I have a brain failure.

Any ideas?

Cheers

Sam
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 10:10 AM.


Copyright © 1999-2023 Kinook Software, Inc.