Kinook Software Forum

Go Back   Kinook Software Forum > Visual Build Professional > [VBP] General Discussion

Reply
 
Thread Tools Rate Thread Display Modes
  #1  
Old 11-17-2005, 09:21 AM
kinook kinook is online now
Administrator
 
Join Date: 03-06-2001
Location: Colorado
Posts: 6,033
Saving all macros and loading them as global macros in the chained project is not a good idea. Global macros take precedence over system macros, so any system macros in the parent project's 'all' collection will become global macros in the child instance, overriding the true system macro values there.

It would be much better to narrow down the original problem to a reproducible case that we can investigate here. Using v6, you could add project-level step script events to log the problem macros before and after each step to isolate when they are changing or getting deleted. In v5, you would have to add the script code to each step's script code (you can multi-select steps and edit step script, but it will replace any existing script code for those steps).

Also, please post the info from Help | About | Install Info. Thanks.
Reply With Quote
Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 01:14 PM.


Copyright © 1999-2023 Kinook Software, Inc.