Kinook Software Forum

Go Back   Kinook Software Forum > Ultra Recall > [UR] Suggestions

Reply
 
Thread Tools Rate Thread Display Modes
  #1  
Old 10-01-2007, 02:14 PM
Quantum7 Quantum7 is online now
Registered User
 
Join Date: 10-01-2007
Location: Netherlands
Posts: 71
Usability - Optimizing task completion

I can use SHIFT-C to instantly flag 1 or more tasks as Completed (more accurately to set the flag of the task to completed).

However, I'd like the "Date Completed" (if present!) to be automatically filled with the current date if I check the Completed flag. This would save alot of mouse clicks while completing tasks (and is in most situations logical ).

Note: I realize this implies a logical relation between attributes that doesn't necessarily exist for every type of item / might not always be desirable.

A configuration option or even a generic mechanism to deal with these kind of situations does seems desirable though.

Possible Idea:
Maybe the mechanism for this feature "Title attribute based on other attribute values" could be generalized to deal with these kind of feature suggestions (that way the way it works could be info item type specific).

Last edited by Quantum7; 10-01-2007 at 02:18 PM.
Reply With Quote
Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 10:08 AM.


Copyright © 1999-2023 Kinook Software, Inc.