Kinook Software Forum

Go Back   Kinook Software Forum > Ultra Recall > [UR] General Discussion

Reply
 
Thread Tools Rate Thread Display Modes
  #1  
Old 03-17-2007, 07:02 PM
janrif janrif is offline
Registered User
 
Join Date: 07-08-2005
Location: Ridgefield CT USA
Posts: 852
Quick Search on Begin Date

yields false results here.

search for begin dates
select one item & remove begin date by unchecking
re-search same criteria
In my test, items w/o begin date still appears in list

Also trying to figure out how to remove/delete/undo pending reminders on items that have been done/completed. There are a lot of un-necssary reminders in the db -- don't know if this makes any difference.

Wondering if there is value in linking 'done' to reminder, i.e when something is done, remindr is automatically cancelled.

Thank you.
Reply With Quote
  #2  
Old 03-19-2007, 12:37 PM
kinook kinook is online now
Administrator
 
Join Date: 03-06-2001
Location: Colorado
Posts: 6,003
That works as expected here. Please ZIP and send or post a .urd file that demonstrates the problem.
Reply With Quote
  #3  
Old 03-19-2007, 01:11 PM
janrif janrif is offline
Registered User
 
Join Date: 07-08-2005
Location: Ridgefield CT USA
Posts: 852
Quote:
Originally posted by kinook
That works as expected here. Please ZIP and send or post a .urd file that demonstrates the problem.
Do you mean marking a reminder item w Date Completed removes the reminder on your system or what exactly?
Reply With Quote
  #4  
Old 03-19-2007, 01:45 PM
kinook kinook is online now
Administrator
 
Join Date: 03-06-2001
Location: Colorado
Posts: 6,003
Re: Quick Search on Begin Date

Quote:
Originally posted by janrif
search for begin dates
select one item & remove begin date by unchecking
re-search same criteria
In my test, items w/o begin date still appears in list
I had an item with a Begin Date of 3/27/2007. Performed an Advanced Search of Begin Date equals 3/27/2007 and the item was found. I made the Begin Date of that item null by unchecking its value. Performed the search again and it was not found.

Quote:
Also trying to figure out how to remove/delete/undo pending reminders on items that have been done/completed. There are a lot of un-necssary reminders in the db -- don't know if this makes any difference.
Clear the Reminder or Begin Date/Time attributes.
Reply With Quote
  #5  
Old 03-19-2007, 01:53 PM
janrif janrif is offline
Registered User
 
Join Date: 07-08-2005
Location: Ridgefield CT USA
Posts: 852
OK, thank you but I guess I'm suggesting that the completed flag or "done" attribute or "date completed" attribute -- something -- be connected to reminder vs the steps you've listed. To me it's logical that if I click "done" in some manner, that whatever shows it is pending is un-set automatically since it is illogical to have one item pending and done at the same time. Maybe I'm missing something.
Reply With Quote
Reply

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off



All times are GMT -5. The time now is 02:31 AM.


Copyright © 1999-2023 Kinook Software, Inc.