Navigation: Actions > Miscellaneous > Set Priority Action |
|
The Set Priority action can be used to set the priority of the build process or another Windows process.
Computer name: Remote computer to set priority on (optional, uses local computer if blank).
Process ID: The process ID (base 10) of the process to set the priority on (required). Use [Builder.ProcessID] to set the process of the current build.
Priority: The priority to set the process to.
Notes:
• | This action utilizes WMI, and your network configuration may need to be adjusted to allow WMI to operate through Windows Firewall; see this article for more details. |
• | By default, this action is not displayed (existing steps will still be displayed in the Step panes and will build normally). To show all hidden actions, right-click in the Actions pane and choose Show Hidden. |